ENG
ESP
power engineers
systems
&
integration
power
&
plant training
ENG
ESP
Home
Group
Voltex Power Engineers
Voltex Systems & Integration
Voltex’ Power & Plant Training
Our Leaders
Jean John Prasanth
Mick Weston
Raúl Barrera
Richard Ratcliffe
Abraham Bittelman
Our Partners
AVEVA™
ETAP™
Schneider Electric
Our History
Our Policies
Privacy Policy
Services
HV Electrical Engineering
HV Equipment Selection
HV Equipment Specification & Verification
HV Technical Manuals
HV Power System Studies
Arc Flash Analysis
Electromagnetic Transient Analysis
Harmonics & Motor Acceleration Analysis
HV/LV Protection Coordination Studies
Load Flow & Short Circuit Analysis
HV Power Systems Design
HV Design & Verification
HV Safe Earthing System Design
Upgrade & Modernisation Design
HV Project Management
Client Representative
HV Installation Testing & Commissioning
Test & Commission Protection Schemes
HV Renewable Energy
AEMO Grid Connection (GC4)
Distributed Energy Resources (DER)
Microgrids
ETAP Energy Management Software
eProtect & NetPM
eTraX – Rail Traction System
ETAP Real Time
HV Audits & Asset Management
Auditing & Compliance
Compliance Certification
Hazardous Area Audits (EEHA)
HV Audits
Safety Management Systems
HV Maintenance
Asset Management
Energy Management & Efficiency
HV End Of Life Management
Reliability & Efficiency Strategies
Risk Management Strategies
HV Systems & Integration
AVEVA Electrical & Instrumentation
ETAP Real Time
Schneider Electric EcoStruxure
Substation Automation Systems
IEC 61850
HV Operator Training
Arc Flash Hazard Safety Training
ETAP Digital Twin Training
HV Isolation & Access Training
HV Protection Systems Training
IEC 61850 Training
SF6 Gas Safe Management Training
Projects
IEC 61850
Infrastructure
Mining & Minerals
Oil & Gas / LNG
Rail
Renewable Energy
Water & Waste
Blog
Innovation
Partnerships
White Papers
Contact
Careers
Home
›
VPE
VPE
VPE
|
VSI
Why do contracts often misalign with project realities?
VPE
|
VSI
Why use the same digital twin for design and operations?
VPE
The Advantages of Digital Twin Microgrid Controllers in Distributed Energy Resources
VPE
The Consequences of Unauthorised Changes to Protection Relay Settings